Please see the gallery below for the weekly updates for each green
On greens with developments, information is provided on the picture
The 1st Green has had its levels taken back to the existing coarse material and drainage
Levels are all exposed, material has been removed.
This shows where the bunker is being moved further to the left at the front as the hole plays.
All material has been excavated
Nearly all of the old greens material has been removed.
As a side note, please exit to the 9th tees, from in front of the temporary green.
The new wall that will go around the front left, and rear of the green, is being built.
You can see on the front left of the picture, where the new extended green will be.