Please see the gallery below for the weekly updates for each green
All of the greens are now fully excavated
The base levels are surveyed, and fill material will be used to ensure the correct levels are achieved
The new drainage will then be installed, along with the irrigation points around the greens and surrounds. On eof the major changes with the irrigation is that the greens will now have double heads (2 sprinkler points) next to each other. This gives better, consistent irrigation coverage on not only the greens, but the surrounds. This will aloow the height of cut to be lower in areas, but will also aid the recovery time on areas where players walk on and off the greens.
Current work is focusing on the 10th green, and the the new 9th/18th double green complex
Below is the gallery of the 10th green, and the 9th & 18th Green
Base levels being finalised. Drainage and irrigation will now be installed
Completed wall to the rear left of the green
Completed wall to the front left of the green
View from the 10th fairway
New bunkers being roughly shaped. Base levels being raised
The black line will be how far the new surrounds come back towards the clubhouse
Power cables being re routed